A 30-line Central Battery switchboard for the North British Locomotive works.
A 30-line Central Battery switchboard for the North British Locomotive works.
Front opened to show the internal wiring
Order No 19602 North British Railway 100-line CB switchboard.
The back has been opened allowing the light to shine through the cable termination section on the left.
The instrument top left is a voltmeter and the associated keyswitches and telephone left are probably for test purposes.
Order No 19602 North British Railway 100-line CB switchboard. Three-quarters side view.
The order number is the same, but I assume this is a different switchboard, since the test panel is on the end.
Order No 19602 North British Railway 100-line CB switchboard.
Seems to be the same as the first switchboard, but the back has been closed.
The key shelf has been lifted to display the wiring.
Order No 19602 North British Railway 100-line CB switchboard.
View from the back with the covers removed
showing the cord terminations and relay cans (left) and cable terminations and fuse mount (right).
200-line CB switchboard for North British Railway locomotive works.
Oddly the first picture is from the back with the covers removed.
This time there is no cable termination section. The jack wiring, cord terminations and relay cans can be seen.
200-line CB switchboard for North British Railway locomotive works. Rather under-exposed view of the front.
There are two operator positions, each already equipped with a headset and breast plate transmitter.